What the ride is like

The first stage out of Queanbeyan is through timbered country and up a gentle 3% gradient to get out of the Canberra valley. After that it's a level but winding run to Cooma. From there the line moves through open country to cross the Great Dividing Range near Nimmitabel. Then it's an easy downhill run through both timbered and open country to the trail end in the township of Bombala.

Most of the trail would be a gravel surface, fenced across private land. Near Canberra and Queanbeyan it might be sealed, as it could form part of the ACT urban cycle network.

The rails running through a shallow cutting near Springs Road

213 km

Queanbeyan to Bombala, the full length of the corridor.

3% maximum

The gradient is never more than 3%, so it suits all abilities.

5 m wide

A semi compacted gravel path would run where the rails and sleepers are now.

30 to 50 km a day

Most riders would cover 30 to 50 km a day, so they'd stop in the villages along the way.

The general area

Locator map of south east Australia with the Monaro Rail Trail route marked between Queanbeyan and Bombala

The route

Elevation profile

The trail follows the old railway, so the gradient is never more than 3%.

What you would see along the way

Inside the Colinton tunnel, the brick lining curving away to daylight at the far end

The Colinton tunnel

The tunnel near Colinton is 160 metres long.

A long timber trestle bridge carrying the disused rail line across open country under a wide blue sky

Timber trestle bridges

Two near Bredbo are heritage listed, and show the quality of trades men's work in the 1880's.

Michelago railway station, a red brick heritage listed building beside the platform

Heritage stations

NSW Heritage listed stations and freight yards at Michelago, Cooma and Bombala.

Maps and videos

A long low timber trestle crossing green river flats

Support the trail

Support the trail

Membership is $10 for individuals and $50 for groups and businesses.