
The trail
The route, the gradient and what you'll see along the way.
What the ride is like
The first stage out of Queanbeyan is through timbered country and up a gentle 3% gradient to get out of the Canberra valley. After that it's a level but winding run to Cooma. From there the line moves through open country to cross the Great Dividing Range near Nimmitabel. Then it's an easy downhill run through both timbered and open country to the trail end in the township of Bombala.
Most of the trail would be a gravel surface, fenced across private land. Near Canberra and Queanbeyan it might be sealed, as it could form part of the ACT urban cycle network.

213 km
Queanbeyan to Bombala, the full length of the corridor.
3% maximum
The gradient is never more than 3%, so it suits all abilities.
5 m wide
A semi compacted gravel path would run where the rails and sleepers are now.
30 to 50 km a day
Most riders would cover 30 to 50 km a day, so they'd stop in the villages along the way.
The general area

The route
Elevation profile
The trail follows the old railway, so the gradient is never more than 3%.
What you would see along the way

The Colinton tunnel
The tunnel near Colinton is 160 metres long.

Timber trestle bridges
Two near Bredbo are heritage listed, and show the quality of trades men's work in the 1880's.

Heritage stations
NSW Heritage listed stations and freight yards at Michelago, Cooma and Bombala.
Maps and videos

Interactive Map
Pan and zoom the full 213 km corridor from Queanbeyan to Bombala on an interactive map.
Trail Videos
Flyover videos of the corridor, close-ups of the tunnel and timber bridges, and interviews with people who live along the line.
Village Precinct Trails
Short trails in each village and town on the Monaro Rail Trail route, so visitors can explore locally. The first one, the Bombala Precinct Trail, is now open.Support the trail
Support the trail
Membership is $10 for individuals and $50 for groups and businesses.


